Old Mutual Centre

Download as PDF Acheter des images

Identification

Old Mutual Centre
103514

Plan

Structure générale

gratte-ciel
construit [achevé]
béton
pieux battus
postmodernisme

Usages

bureaux

Faits

  • A record breaking 13-hour concrete pour, the longest single concrete pour in Durban’s history and one of the largest in South Africa, was performed on this contract.
  • This building includes 27 889 m² of A-grade office space, 2 348m² of ground floor shops, and an adjacent four-storey parking garage.
  • Through a process of pre-qualification and tender, 3G Construction, a joint venture between Group Five Stevenson and Grinaker Building, were appointed.
  • Mature 15m high palms were transported and planted in West Street at the entrance to the building.
  • The site bounded by West, Smith and Gardiner Streets required the demolition of existing buildings with one being dramatically imploded.
  • This is the last major high-rise office block to be built in Durban.
  • The project was awarded first place for contracts in excess of US$12 million in the Building Industries Federation in South Africa’s (BIFSA’s) national safety competition. It also achieved a Building Industry five-star grading for safety on site.

Vous avez besoin d'informations supplémentaires sur ce bâtiment et les entreprises participantes?

Plus d'informations

Lieu

303 West Street Mall
303 West Street
4001
Durban
KwaZulu-Natal
Afrique du Sud

Données techniques

449,48 ft
429,00 ft
33
5
1993
1995
12
406
$29 000 000

Entreprises participantes


Show now
Show now
Show now