ok Nous utilisons des cookies sur notre site pour vous permettre le meilleur service possible. Plus d'informations peuvent être trouvées ici.
Download as PDF

Vue on Main

Identification

Vue on Main
Gayoso Place
186840

Plan

Structure générale

immeuble
jamais construit [annulé]
béton
postmodernisme

Usages

appartements locatifs
activités stationnement

Faits

  • The Vue on Main (formerly Gayoso Place) was selected in May 2003 by the Center City Commission to redevelop the block between Union and Gayoso Avenues on South Main Street, part of which has been vacant since a 1997 fire.
  • Originally a 21-level apartment building, it beat a competing 10-level office building proposed by Washington DC-based Akridge Real Estate Services.
  • Demolition of the existing buildings on the site began in late January 2004 and was complete by March 21, 2004.
  • The developers hired new architects in early 2004, expanding the tower to 28 floors and changing from steel to concrete-framed construction.
  • The Vue on Main was canceled by its developers in summer 2006.
  • The excavated site became known as the "Hole on Main."
  • After a new round of competing proposals, Barboro Flats was ultimately selected in 2007 as the winning proposal to develop the site.

Vous avez besoin d'informations supplémentaires sur ce bâtiment et les entreprises participantes?

Plus d'informations

Lieu

100-114 South Main Street
100 Gayoso Avenue
100-114 South Main Street
38103
Memphis
Tennessee
États-Unis d'Amérique

Données techniques

296,59 ft
296,59 ft
296,59 ft
279,07 ft
9,51 ft
28
1
2004
420
$42 000 000

Entreprises participantes

EDI International

Show now
Show now
Vous avez trouvé une erreur?
Related Buildings