ok Nous utilisons des cookies sur notre site pour vous permettre le meilleur service possible. Plus d'informations peuvent être trouvées ici.
Vous êtes ici:

Manitoba Hydro Tower

Voir toutes les 29 images Download as PDF Acheter des images

Identification

Manitoba Hydro Tower
Head Office of the Manitoba Hydro-electric Board
218664

Plan

Structure générale

gratte-ciel
construit [achevé]
béton
verre
mur-rideau
moderne

Usages

bureaux

Faits

  • The building is being designed with the goal of being the most energy-efficient building of its size in North America, if not the world, consuming 60% less energy than prescribed in the national code for buildings.
  • Developers intend to achieve the Leadership in Energy and Environmental Design (LEED) Gold Certification, currently only held by 16 buildings in Canada.
  • Will be 100% cooled and 50% heated by a geothermal system.
  • Number of occupants: 1800, both Hydro and private tenants.
  • Will reuse 90% of building materials from existing buildings demolished on the site.
  • Top of the structure is a solar chimney.
  • Features a double facade, which creates a buffer between the office and outside environments, allowing for more natural ventilation through the north and south atria.

Vous avez besoin d'informations supplémentaires sur ce bâtiment et les entreprises participantes?

Plus d'informations

Lieu

360 Portage Avenue
360 Portage Avenue
Winnipeg
Manitoba
Canada

Données techniques

377,00 ft
316,60 ft
22
1
2005
21.12.2008
152
$220 500 000

Entreprises participantes


KPMB Architects

Show now
Show now
Show now
Show now
Show now
Show now
Show now
Show now
Show now
Show now
Show now
Show now
Show now
Show now

Spécificités

  • L'immeuble est connu dans cette ville
Vous avez trouvé une erreur?
Related Buildings