ok Nous utilisons des cookies sur notre site pour vous permettre le meilleur service possible. Plus d'informations peuvent être trouvées ici.
Vous êtes ici:

Cass Technical High School

Download as PDF Acheter des images

Identification

Cass Technical High School
New Lewis Cass Technical High School
New Cass Technical High School
Cass Tech High School
243501

Plan

Structure générale

immeuble
construit [achevé]
acier
aluminium
brique
verre
mur-rideau
moderne

Usages

école
théâtre/opéra

Faits

  • This building was LEED certified by the U.S. Green Building Council.
  • The school, which can house 2,200 students, includes an indoor arena, a competition-sized swimming pool, a 1,100-seat theater, a two-story greenhouse, art, music and dance studios, and a state-of-the-art print shop among other amenities.
  • This school replaced the old Cass Technical High School, directly south of the building.

Vous avez besoin d'informations supplémentaires sur ce bâtiment et les entreprises participantes?

Plus d'informations

Lieu

2501-2585 2nd Avenue
600-650 Henry Street, 601-651 Ledyard Street
2501 Second Avenue
48201
University
Detroit
Michigan
États-Unis d'Amérique

Données techniques

121,83 ft
121,83 ft
121,83 ft
110,00 ft
15,00 ft
7
2003
2005
$127 000 000

Entreprises participantes


Show now
Show now
Show now
Show now
Show now
Show now
Show now
Vous avez trouvé une erreur?
Related Buildings