Plan

Structure générale

pont
construit [achevé]
moderne

Usages

trafic routier

Faits

  • The Blue Water Bridge is actually two separately completed spans, one completed in October of 1938, and the second span completed in July of 1997.
  • The bridge links the United States of America and Canada at the cities of Port Huron and Point Edward/Sarnia, where Lake Huron empties into the Saint Clair River.
  • The original span is a cantilever truss bridge, while the second span is a continuous tied arch bridge.
  • The road deck width of the original span is 38 feet, while the width of the second span road deck is 51 feet.
  • The original span rises to a height of 210 feet to the top of the structural steel, and the second span rises to a height of 233 feet.
  • The road deck of the original span of the bridge clears the river by 152 feet, while the road deck of the second span clears the river by 155 feet.
  • The original span of the bridge costed $3,250,000 to construct, and the second span cost a total of $79,269,755 to construct.
  • The total length of the original span (excluding the plazas at either end of the bridge) is 6,178 feet, while the total length of the second span is slightly shorter at a length of 6,109 feet.
  • An average of 14,000 vehicles cross the bridge everyday, with as many as 20,000 vehicles crossing on a busy day.

Vous avez besoin d'informations supplémentaires sur ce bâtiment et les entreprises participantes?

Plus d'informations

Lieu

Blue Water Bridge
48060
Port Huron
Michigan
États-Unis d'Amérique

Données techniques

233,00 ft
233,00 ft
6 178,08 ft
51,00 ft
1937
1938
1997
$82 519 755