ok Nous utilisons des cookies sur notre site pour vous permettre le meilleur service possible. Plus d'informations peuvent être trouvées ici.
Vous êtes ici:

Gateway Bridge

Voir toutes les 10 images Download as PDF Acheter des images

Identification

Gateway Bridge
269142

Plan

Structure générale

pont
construit [achevé]
moderne

Faits

  • Construction was unique because it was done using a fast-track system to permit design and construction to be concurrent, rather than the usual method of completing the design before any construction starts.
  • Height of the bridge is equivalent to a 20 storey building.
  • The distinctive shape is due to air traffic requirements restricting its height to under 80m while shipping needed a clearance of 55m, leaving only 25m to fit 1.5kms of bridge.
  • At time of construction the stressing cables in the approach spans were the highest load cables in a structure in Australia.
  • 150,000 tonnes of concrete, 9,900 tonnes of reinforcing steel and 2,500 tonnes of pre-stressing high tensile steel wire was used in construction.
  • At time of construction the erection truss was the largest in the world, weighing 650 tonnes.
  • Anually since 1997, half the bridge is closed to traffic to accommodate over 20,000 runners in the 'Bridge to Brisbane' charity fun run.

Vous avez besoin d'informations supplémentaires sur ce bâtiment et les entreprises participantes?

Plus d'informations

Lieu

1 Gateway Bridge
4172
Murarrie
East Side
Brisbane
Queensland
Australie

Données techniques

211,61 ft
211,61 ft
5 347,77 ft
1980
1986

Entreprises participantes


Show now
Vous avez trouvé une erreur?